The guy I bought the house from was a long time Grumman employee and had a machine shop in the garage. He built it, with from what I can tell, almost a foot thick slab. Way overkill. I think you need at least 4", but don't quote me on that.
__________________ 2001 Z-28....Gone, but not forgotten! |