thought i would post some of this. this is my one and only daily driver (aka, my work car). i started this project july 24 (bought motor set and started tearin up my 240).worked on it on the weekends. it is dirty as hell but in fairly good shape (does clean up and looks good i think). it will be drove atleast 4 days a week, every week (if i got to go to work i may as well have fun getting there and back

). so looks (paint and rims) will be last thing if they every happen. on with pics (kinda in random order).

heres the headers

stock camaro mounts packed with high temp chalking. seems to really stiffin em up.
how i cut the x-member. i stoped taking pics for awhile so didnt get one of it boxed and welded out.
how it sat in there. it sit alittle lower in the end.
the hood closed. it CLOSED!
moded clutch pedal. was a PITA.
with the rad and fan.
top veiw of fan. to get it in the front had to do alittle cutting. but didnt wanna cut all of it out. how it ended up.
pic of the pan and steering rack. about 1/2-3/4 of a inch space. aint as tight as it looks. but sitting low enough.
the tranny mount and back of headers. mount was made out of 1 1/2 by 1 1/2 angle iron and it also worked great for boxing out the x-member.
little pic of gauges in the pillar, my ebay steering wheel, shifter location, and moded shifter handle. motor came with a short throw shifter. so i moded the handle to my taste.
veiw of the steering shaft going thou the headers and alittle veiw of the motor mounts. we used the stock camaro mounts packed with high temp chalking, then made new u-brackets, then made the stock x-member wider for the bracket to sit on. then drilled holes for two 1/2" grade 8 bolts.
new throttle cable bracket. made from stuff laying around that i didnt use.
the PITA master cylinder in. about 4-6 hours right there.
the motor ended up about 1/2" more forward then planed, but it was the only way to clear everything. shifter (measured from center of the shifter output to center of 240 hole) is 1 and 1/2" forward. so i aint far off from other ppl. maybe that 1/2"
whats left to do. exhaust, drive shaft, wiring (which looks easy), fuel system, then new gauges in a home made dash cluster (yet to be made), battery in truck, etc..
price to date
motor, tran, ecu, wire, shaft, shifter 3800
volt, oil pressure, water temp, gauges 176.26
hsc oil pan package 355
hsc nissan master cylinder 79
hsc new ss clutch line 83.5
shiping 18.5
steering wheel and plate plus s/h 51.87
hsc headers plus shiping 896.63
hsc cooling package and shiping 667.58
cpu vats and rear o2 removel 125
total 6253.34
fuel will be around 600. exhaust, bout 100. alum drive shaft, guessin around 300-400 dunno really. camero came with a alum one but it looks to be like 1 1/2" to 2" to short. gauges will be the last big $$$. freakin speedos are high. end goal when done, $7500. then ofcourse other stuff will follow. like rear end, and then wider rims. was tryin to hit around 10k with rims, tires and paint (paint done myself). think im going to be alittle over thou.
and the only problem i really got is the sway bar. the car was lifted up when i put the motor in and i had about 1/2" to 3/4" gap between the bar and pan. but when the car had weight added and the car sat down that little sway bar moved and is right up on the pan. i dont think bending the sway bar out alittle is going to hurt it thou.