I couldnt find anyone that made a bracket kit to handle all 4 bottles and bolt them to the roll bar so i sat down and designed this setup and cut it out of billet 6061 on my cnc machines .
I finaly got these dam things done today after about a month or so and bolted it all together .
A little more plumbing and a hand full of wiring and she will be spraying again
Im trying to decide on a polished or anodized finish .
I ordered some fat 1/2" s/s quick release pins but they are on back order , so i had to use 1/2 bolts for now :/
